FLYOVER AT CHANDNI CHOWK RAWALPINDI
OVERVIEW
The construction of the Chandni Chowk Flyover was started at a busy locality of Rawalpindi, on November 5, 2011. The flyover was completed in 127 days. The length of the flyover is 403 metres, and it has three lanes each side. On an average, 128,900 vehicles pass through this junction daily and the flyover will help solve the traffic mess on Benazir Bhutto Road, particularly at Chandni Chowk, which had been a great concern for motorists, transporters and commuters.
PROJECT STATISTICS
%0A%0A%5Balign-left%5D,[align-left]|[align-left]Project%20Location,[align-left]Rawalpindi|[align-left]Client,[align-left]National%20Logistics%20Cell%20(NLC)|[align-left]Ownership,[align-left]C%20%26%20W%2C%20Government%20of%20Punjab|[align-left]Consultant,[align-left]Engineering%20Associates|[align-left]Project%20Value,[align-left]PKR%20828%20Million|[align-left]Start%20Date,[align-left]November%2005%2C%202011|[align-left]Completion%20Date,[align-left]March%2010%2C%202012|[align-left;b;c#dd3333]Completed%20In%20A%20Record%20Time%20Of%20126%20Days,[align-left]|[align-left],[align-left]%0A%0A
[/vc_table]
PROJECT HIGHLIGHTS
%0A%0A%5Balign-left%5D,[align-left]|[align-left]Earthwork,[align-left]10%2C825%20m3|[align-left]Excavation,[align-left]15%2C601%20m3|[align-left]Base%2FSub%20Base,[align-left]6%2C425%20m3|[align-left]Concrete,[align-left]28%2C346%20m3|[align-left]Asphalt,[align-left]4%2C317%20m3|[align-left]Reinforcement,[align-left]3%2C434%20Ton|[align-left;c],[align-left]%0A%0A
[/vc_table]